NEW QUESTION # 70
Which organization's general safety codes and regulations must you follow when visiting a job site?
Response:
- A. Your company
- B. The client's insurance company
- C. The AHJ
- D. The client
Answer: C
NEW QUESTION # 71
Which of the following documents should an AV integrator submit in the event that a manufacturer has discontinued a projector model?
Response:
- A. Request for change (RFC)
- B. Construction change directive (CCD)
- C. Letter of transmittal
- D. Progress report (PR)
Answer: A
NEW QUESTION # 72
What should you do with equipment manuals and software documentation?
Select all that apply.
Response:
- A. Arrange them in alphabetical order
- B. Leave a copy with the AV rack
- C. Leave a copy in the storage closet
- D. Arrange them by function
Answer: A,B,D
NEW QUESTION # 73
When removing existing cabling, the AV technician should:
Response:
- A. Make a drawing of how the system is wired
- B. Should cut all cables
- C. Abandon old cabling
- D. Identify and mark what is to be re-used
Answer: D
NEW QUESTION # 74
Which of the following is a form of encryption to protect copyrighted content?
Response:
- A. VESA
- B. HDCP
- C. EDID
- D. HDMI
Answer: B
NEW QUESTION # 75
Which of the following are HDCP authentication steps?
Select all that apply.
Response:
- A. Session exchange
- B. Locality check
- C. Audio and video sync check
- D. Key exchange
Answer: A,B,D
NEW QUESTION # 76
Which device is used for sending the same video signal to multiple destinations?
Response:
- A. Line driver
- B. Scan converter
- C. Matrix switcher
- D. Distribution amplifier
Answer: D
NEW QUESTION # 77
What are key considerations when determining projector placement?
Select all that apply.
Response:
- A. Throw distance
- B. Standard deviation
- C. Offset value
- D. Type of lens
Answer: A,C,D
NEW QUESTION # 78
A primary reason for attending construction meetings is to:
Response:
- A. Identify changes to the original design that will affect the AV installation
- B. Develop a relationship with the other people on the job
- C. Find out the project's completion date
- D. Submit invoices and other budget documentation
Answer: A
NEW QUESTION # 79
An architectural drawing was created using the SI scale of 1:200. You measure a distance of 13 millimeters on the drawing. What is the actual distance in millimeters?
Response:
- A. 260 millimeters
- B. 1,300 millimeters
- C. 5,200 millimeters
- D. 2,600 millimeters
Answer: D
NEW QUESTION # 80
A 1080p HDTV signal with a frame rate of 30 Hz will reproduce images at ____.
Response:
- A. 30 frames per minute
- B. 30 lines per scan
- C. 30 frames per second
- D. 30 lines interlaced
Answer: C
NEW QUESTION # 81
When mounting audio visual equipment, ASTM and SAE (ISO) bolts should have a grade (property classification) of NOT LESS THAN Response:
- A. 8 (8.8).
- B. 2 (3.6).
- C. >8 (10.9)
- D. 5 (5.6).
Answer: D
NEW QUESTION # 82
Why is a plumb bob used during the installation process for a ceiling mounted projector?
Response:
- A. To locate the spot on the ceiling tile for the projector mount opening
- B. To locate high pressure fire control water lines
- C. To calculate the throw line distance to the screen from the mount
- D. To locate a direct line for stable mounting
Answer: A
NEW QUESTION # 83
The ISO numerical scheme is used to _____.
Response:
- A. calculate the length of the hardware
- B. calculate the weight of the material the hardware is made from
- C. test the amount of impurities present in the material the hardware is made from
- D. indicate the strength of the material the hardware is made from
Answer: D
NEW QUESTION # 84
At the end of the project, once installation and verification are complete, acceptance of the completed system is documented in a commissioning report and typically signed by:
Response:
- A. The head technician and/or the building architect
- B. The systems engineer and/or the head of the legal department
- C. The contractor and/or the head of the technical staff
- D. The owner and/or the general contractor
Answer: D
NEW QUESTION # 85
What is a macro?
Response:
- A. Multiple functions activated by separate buttons
- B. A set or sequence of functions activated by a button
- C. A single function activated by a switch
- D. A function activated by a button
Answer: B
NEW QUESTION # 86
The published design weight of a speaker array with mounting hardware totals 212 pounds (96 kilograms). What minimum weight should the substructure and mounting assembly be able to support?
Response:
- A. 500 pounds (227 kilograms)
- B. 424 pounds (192 kilograms)
- C. 1,060 pounds (480 kilograms)
- D. 2,120 pounds (962 kilograms)
Answer: C
NEW QUESTION # 87
What type of connector is shown in the following image?
Response:
- A. BNC
- B. RCA
- C. XLR
- D. VGA
Answer: C
NEW QUESTION # 88
Write the correct name for each symbol in the column on the right.
Response:
- A. E = Elevation flag
- B. D = Detail flag
- C. B = Section cut flag
- D. A = Match line
- E. C = Column lines
Answer: A,B,C,D,E
NEW QUESTION # 89
An RG59 coaxial video cable with an outer diameter of 0.24 inches (6 millimeters) is being installed in a conduit, along with two miniature RGBHV cables with an outer diameter of 0.474 inches (12 millimeters).
If the allowable fill percentage for conduit with three or more cables in the region is 40 percent, what is the minimum inner diameter of the conduit?
Response:
- A. 2.95 inches (75 millimeters)
- B. 1.13 inches (28 millimeters)
- C. 2.38 inches (60 millimeters)
- D. 1.28 inches (33 millimeters)
- E. 1.75 inches (44 millimeters)
Answer: A
NEW QUESTION # 90
What can cause a mounting malfunction?
Select all that apply.
Response:
- A. Installing a mount directly to a ceiling tile
- B. Improperly placing bolts
- C. Connecting a mount to blocking
- D. Exceeding the load limit
Answer: A,B,D
NEW QUESTION # 91
Before starting work in a finished space, it is recommended that the AV technician:
Response:
- A. Vacuum the room as to not get the new equipment dirty
- B. Turn on the air conditioner
- C. Document all existing conditions/damage within the room with pictures
- D. Stack all the chairs in a corner of the room and move the tables
Answer: C
NEW QUESTION # 92
The original LCD monitor specified on the project was not available. The model used to replace it has a lower native resolution than the original monitor. What device could be used to keep the EDID table from now calculating the EDID table to a lower resolution for the whole system?
Response:
- A. Scan Converter
- B. Scaler
- C. EDID emulator
- D. Transcoder
Answer: B
NEW QUESTION # 93
The picture shows a(n) _____ connector.
Response:
- A. DVI
- B. HDMI
- C. HDBaseT
- D. SDI
Answer: A
NEW QUESTION # 94
When a customer adds a newer model display to an existing digital AV system what will impact the system the most and should be reviewed?
Response:
- A. The EDID table of the system should be reviewed and updated if necessary
- B. The color balance of the existing monitors should be redone
- C. The new display should have the exact same connections as the existing monitors
- D. The firmware version in the existing monitors should be updated
Answer: C
NEW QUESTION # 95
......